Safe Work Method Statement Template for Metal CNC Turning Machine
This is a detailed and comprehensive Safe Work Method Statement Template specifically designed for a Metal CNC Turning Machine. It comes filled with general safety measures, tailored to fit your organisation’s needs.
- Pre-filled and Comprehensive: No more guesswork as our template presents you with complete details filled in already, saving a chunk of your time without losing the value of safety your workplace demands.
- Fully Editable and Customisable in Microsoft Word format: Each section of this template can be altered to suit your specific requirements. Because it is entirely editable, you can spin it anyway depending on what suits your needs best.
- Includes project scope and project details: Get a vivid understanding of everything covered under the project. From the scope to minute project details, every iota of information is captured for perfect execution.
- Includes checklist of any high-risk machinery on site: Stay ahead by identifying all high-risk machines on the job site. Our intuitive checklist style helps to single out dangerous equipment ensuring no risks go unnoticed.
- Includes space for recording any staff training: Consistently track the progress of your crew with dedicated spaces for logging all staff training sessions and outcomes.
- Includes before and after risk ratings: Observe the improvement in working situations with before and after risk ratings. This feature allows you to measure the effectiveness of implemented safety measures.
- Includes resources for use of legislative references: Stay up-to-date with legal requirements. We’ve incorporated references to related legislations and regulations for easy reference so you’re always in the know.
- Includes all PPE required: Clearly state all necessary Personal Protective Equipment (PPE) for tasks. This exhaustive list ensures workers are prepared and safe while operating dangerous equipment.
- Includes risk assessment and risk assessment matrix: Identify, analyse, and treat all potential hazards with a straightforward risk assessment methodology and associated matrix. A systematic way to get ahead of issues before they escalate.
- Includes a checklist to ensue all requirements have been covered when implementing the SWMS: Safeguard against missed steps and gaps in safety measures by running through this integral checklist that’s been baked into the template.
- Includes sign off page for all workers and responsible persons: Encourage accountability with our dedicated sign-off sheet. It acts proof of each employee’s understanding and cooperation towards the established safety operations.
- Easy to use, Easy to customise: Designed to be intuitive without feeling generic. The sections are logically ordered making navigation easy thus improving how you work with the template
- Suitable for large contracts and Tenders, including tier 1 contractual work: This is your proficient aide whether you’re applying for sizable government contracts or private tenders, including tier 1 work.
- Quick delivery by email: You’ll receive it fast via email; right after purchase. No unnecessary waiting period as we understand how crucial safety is to your business.
Please note that while the SWMS template can greatly assist your workplace in maintaining a safer and compliant environment, using it does not guarantee complete safety at work. Nevertheless, structured implementation and adherence can translate to improved work safety results.
The Metal Cnc Turning Machine Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:
- 1. Preparation
- Miscommunication
- Not adhering to safety protocols
- 2. Job Planning
- Incorrect measurement
- Material choice error
- 3. Machine Checks
- Equipment malfunction
- Unanticipated start-up
- 4. Testing and Set-Up
- Machine misuse
- Accidental switch or control activation
- 5. Operating Machine
- Exposure to sharp edges
- High noise levels
- 6. Tool Changing
- Caught-in or -between incidents
- Sharp tool hazard
- 7. Maintenance Tasks
- Faulty equipment
- Electrical shock
- 8. Cleaning Activities
- Slipping on fluids
- Chemical exposure
- 9. Shut Down Procedure
- Improper shutdown
- Incomplete process
- 10. Emergency Procedures
- Inadequate training
- Panic during emergency
- 11. Transporting Machine Parts
- Heavy lifting injuries
- Falling objects
- 12. Dealing with Waste Materials
- Improper disposal
- Exposure to harmful substances
- 13. Final Inspection
- Incorrect product specifications
- Missed defects
- 14. Reporting and Documentation
- Failure to report incident
- Misreporting information
- 15. Worker Training and Instruction
- Inadequate training
- Non-compliance with safety procedures
Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.
The Metal Cnc Turning Machine Safe Work Method Statement (SWMS) references:
Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.