Joinery Works Involved In Door Window Installation. Safe Work Method Statement (SWMS)

$96.80

The Joinery Works Involved In Door Window Installation. Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation
  5. Free customisation service. Add your logo and company details

Specifically, the Joinery Works Involved In Door Window Installation. Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Joinery Works Involved In Door Window Installation. Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Joinery Works Involved In Door Window Installation. Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Joinery Works Involved In Door Window Installation. Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Joinery Works Involved In Door Window Installation. Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Joinery Works Involved In Door Window Installation. Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Tripping over tools
    • Inhaling dust
    • Manual handling risks
  • 2. PPE Check
    • Inappropriate PPE
    • Not wearing PPE correctly
  • 3. Removal of existing windows/doors
    • Exposure to glass shards
    • Manual handling issues
  • 4. Measurement for installation
    • Incorrect usage of equipment
    • Errors leading to injury
  • 5. Frame preparation
    • Exposed sharp edges
    • Debris in eyes
  • 6. Installation/Placement
    • Pinch points
    • Overexertion injuries
  • 7. Securing units
    • Misuse of power tools
    • Struck by displaced materials
  • 8. Installing hardware
    • Cuts from sharp objects
    • Misuse of power tools
  • 9. Insulation fitting
    • Contact dermatitis
    • Allergic reactions
  • 10. Sealing
    • Chemical exposure
    • skin irritation
  • 11. Cleaning Up
    • Tripping over debris
    • Eye/hand injury from sharp objects
  • 12. Waste disposal
    • Puncture wounds from discarded materials
    • Back injuries from heavy lifting
  • 13. Post-Installation Inspection
    • Sharp object injuries
    • falling objects
  • 14. Removal and Replacement of Protective Covers
    • Scratches
    • Cuts from sharp edges
  • 15. Final Finish & Check
    • Manual handling injuries
    • Chemical exposure from cleaning products
  • 16. Inform Customer
    • Poor communication can lead to the misuse of equipment
  • 17. Departure Site
    • Slips and trips over tools or materials not cleared properly
  • 18. Post-Work De-Briefing
    • Stress
    • Fatigue due to intense mental focus
  • 19. Maintenance of Tools and Equipment
    • Cuts
    • Punctures
    • Eye injuries from flying debris
    • Electric shock
  • 20. Documentation & Reporting
    • Strain from prolonged computer use
    • Stress from workload

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Joinery Works Involved In Door Window Installation. Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart