Guardrail Installation Safe Work Method Statement (SWMS)

$96.80

The Guardrail Installation Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation
  5. Free customisation service. Add your logo and company details

Specifically, the Guardrail Installation Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Guardrail Installation Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Guardrail Installation Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Guardrail Installation Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Guardrail Installation Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Guardrail Installation Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Trip hazards
    • Electrical hazards
  • 2. Equipment Inspection
    • Faulty equipment
    • Unlabelled equipment
  • 3. Setting Up
    • Crushing hazards
    • Fall from height
  • 4. Marking Out
    • Incorrect markings
    • Unstable ground
  • 5. Guardrail Installation
    • Falling objects
    • Manual handling injuries
  • 6. Tools Use
    • Misuse of tools
    • Noise and vibration
  • 7. Fixing to Structure
    • Structural instability
    • Fall from height
  • 8. Checking Fixings
    • Defective fixings
    • Cutting or piercing objects
  • 9. Site Clean Up
    • Slips
    • trips and falls
    • Hazardous waste
  • 10. Document Control
    • Inaccurate records
    • Misplacement of documents
  • 11. Dealing with Incidents
    • Injury from incidents
    • Lack of proper first aid
  • 12. Equipment Disposal
    • Incorrect disposal of equipment
    • Hazardous waste
  • 13. Demobilisation
    • Moving heavy equipment
    • Injury while packing
  • 14. Post-Work Review
    • Insufficient feedback
    • Ignoring hazards
  • 15. Safety Training Retrospect
    • Lack of training
    • Incorrect safety procedures followed

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Guardrail Installation Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart